Before, after, and what changed.

The same handful of patterns show up across very different businesses. Proof is grouped by the kind of problem, not by a logo wall, so you can find your own.

Full case study

Twelve hours, end to end.

One executive, five systems, and the ledger that reconciles 26.2 hours a week down to 14.2.

Read the full case study

5 patterns, each with one hard number.

Five buckets, not five clients. Nothing here is a named-client result.

11 hours a week targeted down to one short review

A small sales team working leads out of a shared inbox.

Before

  • 11 hours a week across the team spent copying details and chasing.
  • Leads sit untouched when the day gets busy.
  • Follow-up depends on someone remembering.

After

  • Leads arrive qualified, entered, and assigned automatically.
  • Exceptions-only review — roughly 45 minutes a week.
  • Follow-up happens on schedule whether or not anyone remembers.
Built in: 9 days

Two working days targeted down to two hours

Two people compiling the same report from four sources.

Before

  • A day each, every week, collecting and formatting.
  • Numbers arrive late and are already stale.
  • The format drifts depending on who builds it.

After

  • Data collected and analysed on a schedule.
  • The report arrives drafted in your format.
  • About two hours a week to edit and sign off.
Built in: 4 days

A day a week of chasing targeted down to exceptions

Approvals and document generation routed by email.

Before

  • Requests sit in inboxes until someone notices them.
  • The same document is rebuilt from scratch each time.
  • Nobody can say what is waiting on whom.

After

  • Requests routed, chased, and logged automatically.
  • Documents generated from the data you already hold.
  • A live view of what is waiting, and on whom.
Built in: 6 days

Reading time targeted down to review time

Someone reading documents so nobody else has to.

Before

  • Hours each week reading sources that mostly repeat each other.
  • Findings summarised by hand, in inconsistent formats.
  • The reading starts again whenever something changes.

After

  • Sources gathered and de-duplicated on a schedule.
  • Summaries produced in your format, with sources attached.
  • People read the summary and make the call.
Built in: 5 days

Month-end matching targeted down to genuine exceptions

Month-end matching of purchase orders to invoices.

Before

  • Hours of line-by-line matching at every month end.
  • Mistakes found late, or worse, not found.
  • The whole task waits on one person's calendar.

After

  • Matched automatically, to the penny, on arrival.
  • Only genuine mismatches reach a person.
  • An audit trail that updates itself.
Built in: 7 days

If it doesn't save meaningful time, we don't expand it.

Every project starts with a baseline and ends with a number you can check yourself. We agree the measurement before we build, so nobody has to take our word for it.

Hours saved
Time on the task before, measured over a normal week, against time after once the system is running.
Touch count
How many times a person has to open, type, or move the work. Fewer touches means fewer mistakes.
Cycle time
How long the work takes from arrival to done, and how much of that was waiting.
Exception rate
The share of work the system hands back for a human decision. This should fall as the system learns.

Which pattern is yours?

Tell us the job. We'll tell you whether it is a nine-day build or a hard no.